§ 4.16.325 Actions or claims arising from construction defect claims--Statute tolled
4.16.325. Actions or claims arising from construction defect claims--Statute tolled
If a written notice of claim is served under RCW 64.50.020 within the time prescribed for the filing of an action under this chapter, the statutes of limitations for construction-related claims are tolled until sixty days after the period of time during which the filing of an action is barred under RCW 64.50.020.